In addition to the information on our website we can also provide an interactive product presentation by WebEx.
NETCOR Webmeetingassistent
Get a notification about new fixed dates for the webmeeting "[training_name]".
Name:
eMail:
Telephone:
Message:
Best Practice: 1 Gbps, Full-duplex throughput measurement with the new GeNiJack 301
  • Setup for throughput measurement
  • Test configuration, single vs. multiple Pairs
  • When to use delayed session start
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
Best Practice: How to use GeNiEnd2End MultiTrace to analyse and solve poor performance issues faster?
  • Setting-up GeNiEnd2End MultiTrace projects
  • What to consider for an Adhoc and 24/7 MultiTrace project?
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
Best Practice: Troubleshooting performance issues with GeNiEnd2End Application Light
  • What to consider when configuring GeNiEnd2End Application Light tests?
  • How to configure / adjust the Application Light test scripts to your needs
  • Usage / workflow of packet capturing during Application Light tests
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
I love my Wireshark, however can I use it also in 10G networks?
  • Is it possible, to create a high-performance data recorder with Wireshark?
  • How to increase the efficiency for the analysis of fault and performance issues
  • The right tool for the right moment
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
Introduction of GeNiEnd2End 5.2
  • New Alarming and Notification options
  • AdHoc Reporting
  • Preview of following version of GeNiEnd2End, GeNiEnd2End 5.3
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
Solving performance issues faster with Structured Performance Troubleshooting Approach (SPTA)
  • Systematic performance troubleshooting, however with which technique
  • Information overload of performance metrics, the difference between data, information and knowledge
  • SPTA – a 3 layered approach to improve the MTTR
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.
The Key to effective Performance Troubleshooting is a systematic elimination
  • Structured Performance Troubleshooting in practice
    • Window size versus bandwidth – 10 ms round trip time and everything is slow
    • Root cause analysis of packet loss together with your provider
    • Troubleshooting Performance issues in distributed, controller-based wireless networks
 Date Please note
For the moment no fixed dates are planned You can arrange to receive notifications about new plannedd ates. Please use this form.